DHI was commissioned to undertake hydrographic surveys of the approach,
anchorage and jetty area for the Lekir Bulk Terminal, Perak.
The survey included:
-
Bathymetric survey
-
Remote deployed ADCP current measurements
-
Bottom sediment sampling
-
Water level measurements (short and long term)
All survey work was for internal design purposes. Subsequent analysis
performed by DHI included determination of design currents and
morphological regime.