Jimah Power Station

DHI performed a 3D design optimisation study or the cooking water intake and outfall systems for the proposed Jimah Power Plant to ensure acceptable thermal impacts on the nearby mangrove reserve.

In support of a full detailed EIA, DHI further conducted supportive hydraulic studies concerning potential erosion/siltation, hydraulic impacts, impacts on flushing and navigational conditions as well as potential backwater effects in the nearby river and associated risks of increased flood levels.

 